Bathroom Remodeling Project

Customer called to request a repair on a one piece fiberglass shower unit. Fiberglass shower had large multiple cracks allowing water to leak onto his subfloor and down into livingroom ceiling. The fiber glass unit was leaking for a long period of time. As a result of the neglect and extensive water damage to the bottom of the shower support system, a QUALITYAt The Art of Resurfacing Inc we strives for total customer satisfaction, an upfront honest assessment, which includes: providing you, the customer, with a sound foundation of understanding before moving forward with any repair. We back this by our 5 year warranty on all our bathtub resurfacing, bathtub reglazing, bathtub refinishing, and sink and counter top refinishing and resurfacing. spot repair.

This Bathroom was located in Valparaiso Indiana. The Remodel was started on September 7th and completed on September 11, 2013.

Project Details

Why the bathroom remodeling was necessary

If the shower hadn’t been replaced the amount of water that was escaping from the multiple cracks would’ve caused major damage to the sub floor, the framing in the walls, and to the drywall in the downstairs living room. Possibly leading to a later mold problem.

 

Helping clients make lasting decisions

We provided our customer with a few samples of tile for the main walls to replace the old tiles for the bathroom remodeling project as the old ones would have to come down to replace the water damaged wall and flooring. The customer had a specific time frame in which they expected The Art of Resurfacing to complete the project. We were able to abide by the deadline and successfully accomplish repairs within the time frame given.

What We Accomplished in 4 days

Bathroom Remolding Schedule

Bathroom Remodeling: Day One

  • Removed the existing I-piece shower unit
  • Changed the shower valve
  • Centered the drain
  • Set the shower pan in Mortar

Bathroom Remodeling: Day Two

  • Framed the walls
  • Installed Durarock
  • Beddded the seams with a waterproof membrane

Bathroom Remodeling: Day Three

  • Installed the Tile

Bathroom Remodeling: Day Four

  • Grouted the tile
  • Installed the shower doors

We guarantee your bathroom remodeling for 1 years or we’ll make good on any oversights.

Summary of Bathroom Remodeling:

  • Framing
  • Tiling
  • Grouting
  • Installing Shower doors
  • Plumbing new lines
  • Dry walling
  • Shower valve installation

Bathroom Remodeling: Before - Standard Shot

Brinson’s Bathroom, Before Bathroom Remodeling

Bathroom Remodeling: After - Standard Shot

Brinson’s Bathroom, After Bathroom Remodeling


Do It Yourself

For those looking to do it yourself: Check out Bob Villa’s website: Do it yourself!